Owner: Tempe Land Development, LLC General Contractor: Ceco Concrete Construction Description: Form and place five pours of 11,961 cubic yards of concrete for the mat slab. Also placed 5,000 S.F of slab on grade at the ramp and 55,500 S.F of sub slab. Add Comment Sky Harbor C-15 Eel Station 07/19/2010
![]() General Contractor: Haydon Construction East economy parking lot, automated train station with 22,560 S.F. slab on grade, 60,865 S.F. concrete paving and 34,455 S.F. of sidewalks. This is a LEED project. Sky Harbor C-13 Stair Towers 07/19/2010
![]() General Contractor: Burton Construction Adding two stair towers to an existing parking garage with work cinsisting of caissons, grade beams, cast in place walls, and stair pan infills. This is a LEED project. ![]() General Contractor: Turner Construction A new baggage handling systems building including foundations, retaining walls, columns, slab on metal deck, mechanical housekeeping pads, sidewalks, curb and gutter. ![]() General Contractor: Austin Commercial Addition of existing security checkpoint baggage screening facility. Phoenix Crime Laboratory - Phoenix, Arizona 07/19/2010
Owner: City of Phoenix General Contractor: Gilbane Description: One level below grade parking garage with three levels above for laboratory building with foundations, cast in place walls, slab on grade, slab on metal deck, slab on pre-cast, stair pans & landings, plaza walks with curbs, ramp with service yard, and related site work. This is a LEED project. Centerpoint Condominiums - Tempe, Arizona 07/19/2010
Owner: Tempe Land Development, LLC General Contractor: Jones Concrete Construction, LLC Description: Place and finished 1,030,420 S.F. for the 24 Floor Tower, 30 Floor Tower and the Parking Garage. ADOH Forensic Hospital 07/18/2010
![]() General Contractor: The Gilbane Building Company Eight new buildings consisting of 75,000 S.F. of slab on grade, foundations, equipment pads, duct banks, light pole bases and related site work. This is a LEED project. Chapparal Animal Hospital 07/18/2010
![]() General Contractor: MTV Contractors Constructed a new 14,000 S.F. building with foundations, slab on grade, and related site work. Barrow Neurosurgical Office Building 07/18/2010
![]() General Contractor: Urban Edge Builders An addition to an existing building of foundations, 9,000 S.F slab on grade and 6,600 S.F of slab on metal deck with trash enclosures, and related site work. |