Intel Fab 22/32 - Ocotillo Site 07/18/2010
INTEL FAB 22/32 – OCOTILLO SITE General Contractor: Hoffman General Contracting Construction to complete the Process Waste Building that included foundations, slab on grade, pilasters, trenches, pit bottoms, cast in place walls, slab on metal deck, cast in place stairs, with miscellaneous mat slabs, equipment pads and cast in place curbs. The FAB 22/32 Building did variety of work at B03, B04 and B05 that included mezzanines, lift foundations, storage tanks, matt slabs, scrubbers, Peroxide Building, Trimix Building, Shower Pads, variety of equipment pads, concrete curbs, and sidewalks. INTEL FAB 22 Project 1270– OCOTILLO SITE General Contractor: Performance Contracting Group Construction at the B06 that included concrete for ramps, cubs, roof pads, sleepers, stairs, pits, scrubbers, AWN pits, the Chemical Storage Building and other miscellaneous items. INTEL OCOTILLO SITE Jones Concrete Construction, LLC has also worked for the following General Contractor at this site: Advaced Technology Group Inc, Brycon Construction, Corbins Electric, Dynamic Systems, Ricor Inc, SDB Contracting Service, Sturgeon Electric Company, and Turner Construction Company. INTEL CHANDLER SITE Jones Concrete Construction, LLC has also worked for the following General Contractor at this site: Brycon Construction, SDB Contracting Service, and Turner Construction Company. Add Comment Palo Verde Reactor Storage Facility 07/18/2010
![]() General Contractor: W.E. O’Neil Construction of Arizona Foundations, slab on grade, cast in place walls, cast in place deck, and six tilt up panels for the reactor storage facility. NSA-8 Office and Hanger 07/18/2010
Owner: Watts Investments, LLC General Contractor: W.E. O’Neil Construction of Arizona Description: This 15,000 S.F air plane hanger with slab on metal deck of office space and 43 tilt up panels has been awarded by Tilt-Up Concrete Association on the Top Ten List as the Largest Spandrel Tilt Panel of 125’-0”. |








RSS Feed