A.S.U. Biomedical Collaborative 07/19/2010
![]() General Contractor: DPR Construction, Inc A four-story building with a basement mat foundation, elevator pits, slab on grade, slab on metal deck, stair pans with landings, columns, roof walls and curbs, cast in place benches and related site work. This is a LEED Project. Add Comment Agribusiness & Equine Center 07/19/2010
![]() General Contractor: MTV General Contractors A single story masonry building with footings, slab on grade, colored sidewalks, and related site work. Bioscience High School 07/19/2010
![]() General Contractor: Concord, Inc A tilt-up concrete building with form liner and integral color panels. This is a LEED Project. A.S.U. College of Nursing & Healthcare 07/19/2010
![]() General Contractor: DPR Construction, Inc A multi-level structural steel building on caissons, grade beams, footings, slab on grade, slab on metal deck, and stair pans with landings. This is a LEED Project. Owner: Chandler-Gilbert Community College at General Contractor: Adolphson & Peterson Description: At the William’s Campus, a new three-story building for classrooms includes foundations, slab on grade, cast in place walls and columns, slab on metal deck, cast in place stairs and landings, colored and exposed sidewalks, concrete benches and related site work. This project was the cover story for the McGraw-Hill Construction Magazine in the November 2008 Issue, reveals as an environmentally friendly and showing as a LEED gold project and shows for its architecture in the ‘cast-in-place concrete walls flank at the courtyard staircase, and exposed aggregate, integrally colored concrete walkways and exposed aggregate flooring appear inside and outside the building, offering both strength and attractiveness.’ |








RSS Feed